TISAX in Secani

The path to a TISAX assessment in Secani, from the assessment objectives through maturity levels, the self-assessment and the ISA workbook to the audit, the corrective action plan and the labels.

This guide follows the path a company takes to TISAX and shows, for each step, what you do for it in Secani. The assessment itself is carried out by an audit provider that ENX has approved, and ENX issues the labels. You register and share results in the ENX portal; in Secani you record what comes of it.

Set the objectives and the scope

Choose the assessment objectives

Open Frameworks in your workspace and choose Add framework. Pick TISAX · VDA ISA 6.0.3 in the library and answer the ten assessment objectives in the TISAX assessment profile, from Confidential to Special categories (special data). Secani shows the resulting Assessment level (AL 2 or AL 3) and switches the prototype protection and data protection requirements on by the objectives you chose. The saved profile is then shown in the framework's Settings.

Record the scope, the audit provider and the sites

You register the scope in the ENX portal. Then enter the Scope ID, the D-U-N-S number, the contact person, the Audit provider and the Assessment type under Assessment details in the framework's Settings; every change saves at once. Under Sites, Secani lists the sites the framework's asset selection includes. These details later fill the cover of the ISA workbook.

Choose a group assessment

If you set the Assessment type to Group by sampling or Group by rotation, Secani also asks the requirements of the simplified group assessment and counts them as musts. Group by rotation cannot be chosen while a prototype protection objective is chosen. Then pick one of the sites in scope as the Main site; a group assessment without one is marked on the field, and the workbook's cover lists the main site first.

Read and implement the control questions

Read the requirements by objective

The Requirements tab lists the ISA's control questions. On a control question, Publisher's text shows the ISA's unchanged text with its must and should requirements and those for high and very high protection needs, beside Secani's own guidance. Requirements your assessment objectives do not ask for are marked as not asked.

Tick off the requirements

Mark each requirement that is asked as Met or Not met. A should requirement that is not met needs a Justification.

Connect controls, documents and evidence

Link each control question to the controls that implement it on the Controls tab; the control library proposes a control for each control question and reuses controls you already use for ISO 27001. In a control question's context panel, Expected documents shows the document it expects, such as the information security policy at 1.1.1, and whether it is missing, a draft, in review or approved.

Rate maturity

Rate controls on the ISA's scale

On a control, choose the Capability level on the ISO/IEC 33020 scale, from 0 to 5, under Implementation and assessment, and give your reason. This is the scale the ISA rates on; the target is level 3.

Check each control question's level

Secani derives a control question's Maturity level from its controls: it is the lowest level of its required controls and stays empty while one of them has none. If you see it differently, choose Rate level differently and give a reason. A level of 3 or more while must requirements, or asked requirements for high or very high protection needs, are open shows as a check on the control question.

For the control questions the ISA rates per site, the control question shows Level per site once the framework's scope includes sites: there you choose each control's level at each site, or leave it at the control's own level. The control question's level is then the lowest of its sites.

Follow the result

On the Requirements tab you filter by Below target or Not rated. The framework's Dashboard shows, under Maturity, the Result with levels above the target cut back to it, the number of control questions below target and not rated, and the Maturity by chapter as a radar chart. The Roadmap tab shows the steps to the labels; Secani ticks most of them off from your data, such as "Measures rated for maturity".

Self-assessment and ISA workbook

Complete the self-assessment

Choose Start self-assessment on the Assessment tab. Secani records each control question's level with its basis; the data protection questions are answered OK or Not OK, without a level. Complete self-assessment stores the result, who completed it and when. Each control question below target and each data protection question answered Not OK then leaves a proposed finding in the Inbox; it is created only when you accept it.

Download the ISA workbook

On the Documents tab, Download ISA workbook gives you the ISA's original workbook, filled with the cover, levels, implementation descriptions, reference documents, findings and measures. Before a self-assessment is completed it is available only as a Draft. This is the file you give your audit provider.

From two sites in scope on, the download menu also offers Per site, with one workbook for each site or Every site, one file each; a site's workbook rates the control questions rated per site with that site's level. Complete self-assessment also freezes each site's level, so a completed workbook per site shows the levels of the self-assessment.

Take over a filled workbook

If you already have a filled ISA workbook, choose Upload filled workbook at the ISA workbook on the Documents tab. Secani shows what it found, and Create proposals puts one proposal per control question in the Inbox: a control from the library, a capability level or a different rating, plus the details from the cover. Nothing changes before you accept a proposal.

A site's workbook cannot be imported; upload the workbook of the whole scope.

Audit, corrective action plan and labels

Record the audit

On the Assessment tab, create your audit provider's assessment under Audits with Create audit, with its assessment level, kick-off, assessment, Closing meeting, follow-up assessment and Overall result. Create finding records each finding on its control question, as a major or minor non-conformity, an observation or room for improvement. Each finding gets a corrective case under Corrective actions.

Work off the corrective action plan

A corrective case from an audit is due three months after the closing meeting. Six or nine months are possible with a Reason for the deadline, no more. The owner is reminded 30 days before the deadline. Download corrective action plan gives you the plan as CSV or Excel for the audit provider.

Record the labels

ENX issues the labels after the assessment. Enter each one on the framework's Dashboard with Create label, with its assessment objective, temporary or permanent, and Valid until. Secani reminds the owner 90 days before it expires. Labels are shared in the ENX portal; in Secani, Offer in the Trust Center marks that a label is offered.

Prototypes, data protection, suppliers and NIS2

Keep security areas

Give a site, building or room under Assets a Security zone and mark whether prototypes are kept there (Prototype area). The control question on the physical security concept for prototypes lists these areas in its Assets card.

Record customer requirements per order

When a customer sets prototype rules for an order, choose New obligation under Obligations, the Source type Contract and a Prototype rule: Classification, Transport, Storage, Camouflage and testing, or Events and shoots. Name customer and order in the Reference code, such as customer-a:order-4711; Secani links the obligation to the matching prototype protection control questions, and on ISA 2027.1 control question 8.1.2 lists the orders in its Obligations card.

Connect processing activities

The data protection control questions that expect the record of processing activities or the data processing agreements list the processing activities from Privacy; for the agreements, those in which your organization is the processor.

Record your suppliers' TISAX labels

On a supplier under Vendors, choose Add evidence with the type TISAX and enter the scope ID, the assessment objectives and the expiry date. The supplier then shows the label with its objectives, assessment level and expiry, and the usual evidence reminder comes before it expires. Secani's vendor questionnaire asks for the label.

The control questions on suppliers (6.1.1 to 6.1.3 on ISA 2027.1; 6.1.1, 6.1.2 and 1.2.4 on 6.0.3) list your organization's suppliers in their Vendors card, each with the state of its label, such as TISAX valid until … or No TISAX label. Under Expected documents you see whether the Register of suppliers, the Register of non-disclosure agreements and the Responsibility matrix with IT service providers are in place.

Cover NIS2 with your TISAX work

When you add NIS2 Deutschland, the control library proposes, for the duties of Articles 20 and 21, the controls you implement for the ISA control questions that ENX's opinion "NIS2 fulfilment through TISAX" names. This mapping is marked as a draft. The reporting duties of Article 23 stay open with controls of their own.

Move to ISA 2027.1

From 1 January 2027 the library offers TISAX · VDA ISA 2027.1. A framework on ISA 6.0.3 then shows New edition available: VDA ISA 2027.1; with Move to new edition, unchanged and renumbered control questions keep their controls, levels and evidence. Changed, merged and new control questions appear as suggestions to review.

With the Secani agent

Ask Secani in the chat or over MCP which control questions are below target and why. The agent can also tick off requirements, keep the assessment details and start or complete a self-assessment. It cannot rate a level differently; you do that on the control question.

Secani's guidance for both ISA editions is an editorial draft whose expert approval is still pending. The published VDA ISA and the scope agreed with your audit provider remain authoritative.